Client: Kelda Organic Energy
Encon was contracted to design and construct 2 waste facilities for Kelda Organic Energy. The first was for the construction of a 35,000 tonnes per annum anaerobic digestion facility off Rover Way in Cardiff.
The scope included:
- Dealing with asbestos ground contamination
- Piling
- Reception Building
- Tank substructures and superstructures
- Reinforced concrete bund wall
- Concrete hardstanding and access roads and drainage
Acting as principal contractor Encon was responsible for the liaison and co-ordination of the process installation up to commencement of cold commissioning. The second follow on contract was for the construction of a “green waste” composting facility at Lamby Way in Cardiff.