We were awarded this multi-million-pound contract which comprised the enabling works and the main civils works for the construction of an Anaerobic Digestion Plant in Aberdare.
Construction works consisted of: A process hall including amenity area; Hard standing around the process hall; Tank farm including the tank bases and 4.5m high RC retaining walls; Bulk earthworks and excavation; Attenuation Tank; Rainwater Harvesting; Process RC pipework chambers; RC carriageway construction; Foul and surface water drainage; Drilling & Grouting Piling; Vibro Piling; Concrete/Steel Driven Piling; Push walls; Concrete foundations; CHP Compound.