Encon was contracted to design and construct 2 waste facilities for Kelda Organic Energy. The first was for the construction of a 35,000 tonnes per annum anaerobic digestion facility off Rover Way in Cardiff.
Read More
Client: Kelda Organic Energy Encon was contracted to design and construct 2 waste facilities for Kelda Organic Energy. The first was for the construction of a 35,000 tonnes per annum anaerobic digestion facility off Rover Way in Cardiff. The scope included: Dealing with asbestos ground contamination Piling Reception Building Tank substructures and […]
Read More
Client: Kelda Organic Energy Encon was contracted to design and construct 2 waste facilities for Kelda Organic Energy. The first was for the construction of a 35,000 tonnes per annum anaerobic digestion facility off Rover Way in Cardiff. The scope included: Dealing with asbestos ground contamination Piling Reception Building Tank substructures and […]
Read More
Client: Kelda Organic Energy Encon was contracted to design and construct 2 waste facilities for Kelda Organic Energy. The first was for the construction of a 35,000 tonnes per annum anaerobic digestion facility off Rover Way in Cardiff. The scope included: Dealing with asbestos ground contamination Piling Reception Building Tank substructures and […]
Read More
Phil is the Managing Director of Encon Construction and as such is responsible for overseeing all aspects of the Company including Health & Safety and ensuring all Civil Engineering projects and Construction projects are carried out to the highest standards. Phil has over 30 years’ experience and is highly respected throughout the industry. He is a Fellow of the Institution of Civil Engineers and a past chairman of the Civil Engineering Contractors Association.